This project involved the precision build of a raised platform engineered to stabilize the Chemist's robotic dispensing equipment. The raised floor features reinforced framing and durable sheet flooring to ensure optimal load distribution, accessibility, and long-term performance within the facility.
Construction of a raised timber floor structure to support the installation and operation of a fully automated medicine dispensary robot system.




